Plot twist - we moved the location of the generator.  Due to concerns regarding the original placement of the generator which was next to the garden area at the back of the Cumming Library, we have decided to move the placement of the generator to next to the dumpsters area near the headquarters staff parking area.  The concrete pad has been poured and the switch has been installed in the electrical closet at Cumming.  The next steps are to install a new gas meter for the generator.  While we wait on the gas meter to be installed, here is a photo of the new concrete pad.  